Quality

Inspection and documentation

Every weld is looked at and every structure is measured before it leaves. What is recorded, and which records travel with the delivery, is fixed by the certified system and by what the order asks for.

Inspection

Every weld is visually inspected to EN ISO 17637 against the quality level of EN ISO 5817 the drawing or EXC2 requires, before painting hides it. Supplementary non-destructive testing beyond visual, ultrasonic, magnetic particle or penetrant, is performed to the extent the drawing or EN 1090-2 requires and on request beyond that.

Dimensions are checked against the drawing with a six-axis FARO Arm Prime 10 measuring arm, to the tolerances of EN ISO 13920 or the tighter ones the drawing states. Machined faces are measured after machining, not before.

Non-destructive testing beyond visual

Visual testing to EN ISO 17637 is standard on every weld. Ultrasonic, magnetic particle and penetrant testing are performed to the extent the drawing or EN 1090-2 requires for the execution class and the joint, and arranged on request beyond that. The scope of supplementary NDT, the standard it is performed to and who performs it are agreed at drawing review and written into the order.

What ships with the work

Under EN ISO 3834-2 the welding documents exist for every order. Which of them travel with the delivery depends on what the order asks for; this is the default split.

DocumentStandardAvailability
Welding procedure specifications (WPS)EN ISO 15609-1Standard
Welding procedure qualification records (WPQR)EN ISO 15614-1Standard
Welder qualification certificatesEN ISO 9606-1Standard
Visual weld inspection recordEN ISO 17637, EN ISO 5817Standard
Dimensional inspection reportEN ISO 13920, FARO arm reportStandard
Material certificates 3.1EN 10204 3.1On request
Supplementary NDT beyond visual (UT, MT, PT)UT, MT, PTOn request
Coating thickness reportcoating thickness reportOn request

A declaration of performance under EN 1090-1 is not offered on this site: the parent company publishes no EN 1090-1 factory production control certificate. Work is executed to EN 1090-2, execution class EXC2, under the certified EN ISO 3834-2 system.

Assembly and inspection

Also under quality

Start here

Send the drawing. We answer with a price and a date.

STEP, DWG, DXF, PDF or ZIP, up to five files. Your drawings stay private: they are stored outside the web server and read only by our engineers.